Average Monthly Electricity Consumption (units) | Suitable Rooftop Solar Plant Capacity |
---|---|
0-150 | 1 – 2 kW |
150-300 | 2 – 3 kW |
>300 | Above 3 kW |
(Save up to 300 units on electricity bills)
Solar Prabha began with a commitment to utilise the potential of solar power to revolutionize energy consumption in the North East with sustainable solar solutions. Solar Prabha is a sub unit of the reputed Kailash Chandra & Sons the authorised product supplier of Har Ghar Jal Jivan Mission in the North East.
In alignment with government initiatives like the PM SuryaGhar Muft Bijli Yojana, we are actively promoting the widespread adoption of solar energy in the North East. We have set out to not only provide reliable solar solutions products but also contribute to a green future.
We see ourselves as the leading provider of solar energy solutions, serving both residential and commercial clients across the North East.
Solar Prabha's team of 30 professionals assists consumers in portal registration, bank loan application , installation and beyond.
Our customized solar systems meet your specific energy needs and budget.
We source the best products from reputable manufacturers, ensuring optimal performance and longevity.
At Solar Prabha, we offer a five-year service guarantee after installation, fostering lasting relationships and peace of mind for eco-conscious consumers.
We provide efficient and safe installations
Save big with competitive rates and flexible financing options
It is not fully free but there is very huge amount of subsidy provided by Government of India. There is subsidy from
central and state government after installation.
Assam is a special cateogary state hence central subsidy here is 10% higher than other states. Central Govt Subsidy (for Assam) : 1 KW – Rs 33000, 2KW – 66000, 3KW & Above – 85800
Every State has additional State Subsidy which is different from state to state. Assam State Govt Subsidy : 1KW- Rs
15000, 2KW – 30000, 3KW & Above – 45000
Central + Assam State : 1KW 48000, 2KW 96000, 3KW & above 130800
Step 1: Register yourself in Portal ( Documents needed APDCL Consumer number, mobile number for OTP, Portal will
fetch all details from consumer number. )
Step 2 : Select KW capacity ( you can change later also)
Step 3: Select Vendor ( you can change later also)
Step 4: Agreement between Vendor & Consumer on Rs 100 stamp paper. Agreement format in Portal. Vendor will print Agreement on Rs 100 Stamp paper. After Signing Consumer/Vendor ( any) to upload agreement on portal.
Step 5: If Bank Loan needed – In portal choose bank load option. On selelection of Bank Loan option you will be redirected to Jan Samarth Portal. Consumer to provide Aadhaar number there and authenticate. Annual Income amount to be submitted. (If annual income above 3 lacs ITR to be submitted. If below 3 lacs no ITR needed). Select Bank and Branch. Receive Digitally approved in principal sanction letter. Vendor Quotation, In Principal Sanction Letter & Portal Registration Acknowledgement to be submitted physically to Bank Branch for loan processing. If CIBIL is above 650 and consumer age below 65 years then Bank Loan approval within 2 days. If CIBIL score below 650 loan will not be approved. If age is above 65 years then consumer number can be transferred in other family member name and start from Step 1. Bank will make payment to Vendor. After Vendor received payment from Bank they will start installation process. This is to be noted that consumer has to pay his 10% to Vendor after the quotation is submitted.
Banks finance up to 90% of the Solar Plant costs.
Step 6 : No Bank Loan needed – Consumer to make payment to Vendor and Vendor will start installation process.
Step 7 : After installation, vendor to submit installation report in the portal.
Step 8: After Vendor Installation Report , APDCL will inspect the installation and submit commissioning report in the portal.
Step 9: Agreement between Consumer & APDCL for Net Metering Arrangement (Formal will be provided by vendor) 2 copies. I copy with Consumer and 1 with APDCL
Step 10: APDCL will install net meter at consumer site. (Self consumption of electricity units and export to APDCL Grid will be recorded in this meter)
Step 11: Consumer will submit bank details and cancelled cheque for subsidy claim in portal.
Step 12: Central Govt will submit Central Subsidy directly in the bank account of Consumer. Payment by Central Govt on 15-30 days usually
Step 13: State Goverment will borrow data from Portal after central goverment subsidy payment. After this State Goverment will pay directly to consumer in their bank account.
There is no extra document submission or paper work needed to get State Subsidy. After Central Government Subsidy payment State Government will pay on its own directly.
1 KW Solar Panel generates minimum 100 Units in 1 month
In summers this can increase from 100 to 130 units per month
2KW , 3KW and above will increase proportionally
No. This is On Grid system which does not require any battery storage system. If you produce solar energy more than you consume it will automatically go to APDCL grid. If you produce less than demand then APDCL grid will directly provide extra electricity. There is no need and use of storage.
No. Solar System will shut down during APDCL power outage. This is done keeping safety of lineman and other people and systems. If a lineman is working on the line and for his safety APDCL cut the power but Solar System provides power to the grid then lineman safety is compromised.
Units supplied by consumer to APDCL will be deducted from units supplied by APDCL to consumer. This will be carry forwarded to subsequent month if unit supplied by consumer to GRID is more than unit supplied from GRID to consumer.
We supply bifacial mono perc half cut PV panels. This is the latest technology which has more efficiency. These are Made in India panel in adherence to Goverment of India policies.
The warranty of the system is for 5 years. If there is any fault in the system consumer will contact the vendor. Vendor will rectify the defect upto 5 years from the date of installation.